A Guide to Implementing the Theory of Constraints (TOC)

PowerPoints

Preface

Introduction

Contents

Next Step

Advanced

 

Bottom Line

Production

Supply Chain

Tool Box

Strategy

Projects

& More ...

Healthcare

 



 

 

 

 

 

 

 

Clients-Only – Excel Dice Simulator

Please click here to download Excel Production Dice Simulator

The Excel Production Dice Simulator allows us to view and repeat a whole range of stochastic interactions in a compressed time-frame.  Through such experience and testing we can better understand the components of drum-buffer-rope within the context of 5 step focusing process of; identify, exploit, subordinate, elevate, & on-going improvement.

Simulations are;

Balanced

Unbalanced

1 Normal variability

1 Internally constrained & un-gated

2 Reduced variability station E

2 Internally constrained, un-gated, & exploited

3 Reduced variability stations E & C

3 Internally constrained, gated, & exploited

4 Reduced variability stations E, C, & A

4 Internally constrained, exploited, & buffered

5 Reduced variability all stations

5 Internally constrained, buffered, & elevated

 

6 Internally constrained, buffered, & elevated

 

7 Externally constrained

 

You will need to enter a password (provided) in order to open this file.

This Webpage Copyright © 2008-2009 by Dr K. J. Youngman